West Bengal Gets ₹1,055 Crore for Road and Bridge Projects
West Bengal has received approval for ₹1,055.33 crore for four road and bridge infrastructure projects under the Central Road and Infrastructure Fund (CRIF). The allocation includes funding for three road projects and a new four-lane bridge over the Dwarkeshwar River at Arambagh in Hooghly district.
Of the total allocation, ₹679.55 crore has been approved for three road projects, while ₹375.78 crore will be used for the proposed second Ramkrishna Bridge under the Setu Bandhan Scheme.
New Four-Lane Ramkrishna Bridge Planned at Arambagh
The proposed second Ramkrishna Bridge at Arambagh will be 384 metres long and 27 metres wide, featuring four lanes. The new bridge is expected to improve connectivity across the Dwarkeshwar River and ease traffic movement in the region.
The existing Ramkrishna Bridge was constructed in 1965. In August 2025, a section of its guardwall collapsed, prompting restrictions on heavy vehicles. The proposed additional crossing is expected to address the growing infrastructure requirements and improve road connectivity for commuters and transport operators.
₹679 Crore Approved for Three Road Projects
The remaining ₹679.55 crore has been sanctioned for three road development projects across West Bengal. However, details of the individual road projects and their proposed construction timelines are yet to be announced.
According to the Union Government, the approved infrastructure projects are expected to reduce travel time, improve regional connectivity and support economic activities, including trade and tourism.
The ₹1,055.33 crore approval marks a significant allocation towards strengthening West Bengal's road and bridge infrastructure, with the proposed Ramkrishna Bridge expected to be an important addition to connectivity in the Arambagh region.